Showing posts with label tiling. Show all posts
Showing posts with label tiling. Show all posts

Saturday, 8 December 2012

Not long to go now

There is 5 days until our apparent handover date.

Our PCI walk through was pushed back from last Wednesday afternoon to tomorrow afternoon.

The list I posted last week still has a lot outstanding which concerns me.

The things that got completed from the list were insulation was spread in the roof, the tiler completed the tiling upstairs, but still needs to return to finish the splashback and the inside was cleaned up a bit.

Which leaves 5 days for the following things to be done.... as well as a few defects we've picked up along the way.

- shower screens, wardrobe railings, shelving in pantry, mirrors
- fly screens and screen doors
- acid burnt bricks need replacing & a few bricks need fixing.
- inspection point needs to be bricked up
- timber screen to the front facade needs to be installed (enter worlds slowest carpenter again!)
- paint touch ups
- carpet
- tiling - kitchen splashback
- stair case needs to be stained
- site clean up
- internal clean (final clean)

Carpet is meant to be tomorrow, staircase was meant to be painted on Saturday, which didn't happen.
Our SS queried our stain colour, which has made me nervous. We had chosen Ebony as per the display home, but our SS said it's very dark, so a few frantic phone calls to the lovely interior ladies and I am hoping it turns out okay.

We NEED to handover on Friday as we have to hand back our rental keys on the Tuesday afternoon.

In other news, one of our lounges has been delivered, it is still in boxes, can't wait to open it!!
Our rental resembles a warehouse with boxes everywhere. The clutter is making me twitchy.

The DA for the retaining wall was approved last week. So will be ready to start that as soon as we're in.

Good news, the bank valuation has come through and I can pick up the final cheque on Friday morning, I am so glad that is all sorted, I was petrified that the bank would delay things.

Fingers crossed everything falls into place this week, I can't wait to move into my beautiful new home, and unpack all our belongings that have been boxed up for over a year now.

Better keep packing, there is still a bit to box up & a whole lot of cleaning to do!










Thursday, 29 November 2012

Countdown is on!

2 weeks until handover...

Assuming all goes to plan.

I am quietly confident that everything will come together nicely, but I don't want to get my hopes up too high.

We have handed in our notice to our real estate agent, paid for our insurance and we received our final progress payment yesterday and that has been sent off to the bank.
Let's hope the bank gets its act together and processes it quickly and doesn't delay anything.

We had a sticky beak in the window yesterday, the tiler has been there tiling the main living area floor downstairs. It looks fantastic.

We have a walk through booked in for next Wednesday, so hopefully all the little things that need doing will be done or close to being done.

A few things left to do still;
- shower screens, wardrobe railings, shelving in pantry, mirrors
- fly screens and screen doors
- insulation in the roof requires spreading
- acid burnt bricks need replacing & a few bricks need fixing.
- timber screen to the front facade needs to be installed
- paint touch ups
- carpet
- tiling - a couple of tiles need to be done
- stair case needs to be stained
- site clean up
- internal clean

And then the obvious ones, all the installation of appliances etc on handover.

We are taking delivery of one of our lounges next Wednesday, not sure where we'll store that, but King couldn't deliver it once we were in because their warehouse is under renovation.

The DA for retaining walls should be through soon, we had to submit additional paperwork, so now we just wait!
That's our Christmas job, installed 900mm high retaining walls to the rear of our block and to the sides.



Sunday, 28 October 2012

The start of Week 20!

My last update was filled with a list of jobs that would be done last week.

None of them were done! In fact there were 8 days where the house sat untouched!
That's not good for the stress levels when you have paid for 90% of the house + rent + land repayments.

Finally on Saturday there were tilers there again. They tiled 2 niche in the showers and the bath in the main bathroom. They still need to do the mosaic splashbacks in the bathrooms and grout.

Our supervisor had originally said mid-late November for handover, I doubt that will be the case!
It's frustrating considering our lease expires on the 8th of November.

There is still so much to do, and lots of half jobs done....
Remember the carpenter who was doing the cladding.....the one who started in August.... Well he hasn't finished yet!!
We've been "locked up" for just over a month but there is no sign of our front door, due to a supplier problem and an error in the brickwork to the front of the house which means our door frame won't fit, so bricks need to be knocked out and re-done.

It's disappointing to see other quality builders who started after us with compariable houses (in size and detail) are wizzing past.
We picked this builder based on the speed of build, but it seems that construction time is a lot slower than we were initially anticipating.
Could it be due to the builders undertaking their own turn key developments in neighbour areas?

Fingers crossed things fly this week...



In good news my blog has now hit over 10,000 views! Thank you so much for sharing my journey, I feel very humbled that people take the time to read and contact me to ask further questions.


Friday, 19 October 2012

Another update

It's been a few weeks since my last update.

Since the last update the wet areas have been tiled and grouted.
The kitchen and pantry splashback has been tiled and grouted.

In the coming week, the tiling should be completed - the main floor is done after the painter has been through. Kitchen bulkheads should be framed up and the gyprockers will return to finish the bulkheads and patch up around the stairs & a few other things that needed to be set.

I've also done a little bit of retail therapy over the last week, some towels, hand towels and some cushions for the lounges. Can't wait to put all the finish touches on our home.
Not sure when we'll be in, our supervisor said he expects it to be finished mid-late November, so we'll see how we go.
We were lucky enough to get a few photos of the tiling.

So here they are:
We weren't 100% on the kitchen splashback when we first saw it, but I love it now, it's really unique, a few people who I have shown the photos to have asked if it's rusted metal, it is really rustic looking and will look fantastic once everything comes together.

Kitchen - Splashback

Butlers Pantry
Kitchen - Splashback
Ensuite
Ensuite

Friday, 5 October 2012

October Update

Not much to report this week, with the long weekend it has been a bit slow.

Tiles have been delivered, baths and laundry tub have arrived too.

So I suspect there will be more to report next week.

Over the long weekend we did a little more shopping, a few essentials.
We bought bar stools for the island bench and a dishwasher.
I can't wait to use it the dishwasher. In the 8 years we have been together we have never had a dishwasher.
It's ASKO and it is fully integrated.

We also had a look at some pendant lights for over the island bench and like the look of some concrete pendants.
We will buy these in the coming weeks. There are few items of furniture still to be purchased, but they aren't vital, we can slowly add these as we find them.

Our second last progress payment came thru yesterday so the end is drawing near.

Here are some photos;



Bar Stool on the Right




                     ASKO - Dishwasher