Saturday, 8 December 2012

Not long to go now

There is 5 days until our apparent handover date.

Our PCI walk through was pushed back from last Wednesday afternoon to tomorrow afternoon.

The list I posted last week still has a lot outstanding which concerns me.

The things that got completed from the list were insulation was spread in the roof, the tiler completed the tiling upstairs, but still needs to return to finish the splashback and the inside was cleaned up a bit.

Which leaves 5 days for the following things to be done.... as well as a few defects we've picked up along the way.

- shower screens, wardrobe railings, shelving in pantry, mirrors
- fly screens and screen doors
- acid burnt bricks need replacing & a few bricks need fixing.
- inspection point needs to be bricked up
- timber screen to the front facade needs to be installed (enter worlds slowest carpenter again!)
- paint touch ups
- carpet
- tiling - kitchen splashback
- stair case needs to be stained
- site clean up
- internal clean (final clean)

Carpet is meant to be tomorrow, staircase was meant to be painted on Saturday, which didn't happen.
Our SS queried our stain colour, which has made me nervous. We had chosen Ebony as per the display home, but our SS said it's very dark, so a few frantic phone calls to the lovely interior ladies and I am hoping it turns out okay.

We NEED to handover on Friday as we have to hand back our rental keys on the Tuesday afternoon.

In other news, one of our lounges has been delivered, it is still in boxes, can't wait to open it!!
Our rental resembles a warehouse with boxes everywhere. The clutter is making me twitchy.

The DA for the retaining wall was approved last week. So will be ready to start that as soon as we're in.

Good news, the bank valuation has come through and I can pick up the final cheque on Friday morning, I am so glad that is all sorted, I was petrified that the bank would delay things.

Fingers crossed everything falls into place this week, I can't wait to move into my beautiful new home, and unpack all our belongings that have been boxed up for over a year now.

Better keep packing, there is still a bit to box up & a whole lot of cleaning to do!










Friday, 9 November 2012

November Update

Time for a November update....

Since my last update, we've had some action.

After paying for lock up 6 weeks ago... we finally have a front door, and it is so beautiful.

The carpenters had to knock out some bricks at the top of the door for it to fit as the bricklayers had bricked it up for a normal door, not  a pivot door.
The front porch ceiling has now been sheeted and the cladding out the front is finished now.

The carpenters have also been through and done the bulkheads in the kitchen/pantry, and redone the bulkhead over the stairs, as it was too low with the lowered ceiling.
We are thankful that our supervisor picked this up, we're both average height and hadn't realised that tall people would hit their heads on the way down.

The gyprockers have been through and fixed up the bulkheads, some areas to the stairs, downstairs powder room & man hole.

The painters started yesterday, doing the first coat of paint on walls and ceilings.
The gyprockers will be back before they do anymore painting to patch imperfections on the walls etc

Our supervisor phoned yesterday to confirm a few paint things.
We are staining the internal sliding door to the laundry and the external laundry door, the external garage door will also be stained, and the front door will be stained too.

The staircase is going to be stained the same as the display home at Kellyville.
I can't wait to see the staircase unveiled and finished off.

So this weeks action plan is paint & gyprock.

With 6 weeks until Christmas, I am starting to doubt we'll be spending Christmas in our new house.
Maybe Santa will bring me a miracle.... I've been good all year, I promise!!