Showing posts with label tiles. Show all posts
Showing posts with label tiles. Show all posts

Friday, 5 October 2012

October Update

Not much to report this week, with the long weekend it has been a bit slow.

Tiles have been delivered, baths and laundry tub have arrived too.

So I suspect there will be more to report next week.

Over the long weekend we did a little more shopping, a few essentials.
We bought bar stools for the island bench and a dishwasher.
I can't wait to use it the dishwasher. In the 8 years we have been together we have never had a dishwasher.
It's ASKO and it is fully integrated.

We also had a look at some pendant lights for over the island bench and like the look of some concrete pendants.
We will buy these in the coming weeks. There are few items of furniture still to be purchased, but they aren't vital, we can slowly add these as we find them.

Our second last progress payment came thru yesterday so the end is drawing near.

Here are some photos;



Bar Stool on the Right




                     ASKO - Dishwasher






Kitchen Splashback Tile


Saturday, 1 September 2012

Could it be a speedy September?

What an end to a slow August!

Friday saw the scaffolding being removed, the timber frames for the front porch installed and the roof rails put up on the back roof.

Next week our back roof should go on, as well as the garage roof and porch roof. Once this is done the cladding will be finished off.

Lock up is drawing closer but no real time frame.

The golf clubhouse opened yesterday, we went for lunch there today.
We parked out the front of our house and walked the 250m to the clubhouse.

Here are some photos of our house with the scaffold down.

Friday, 17 August 2012

Quick update & a nearmap view

Gutter, fascia and roof tiles were completed at the start of the month.

Eaves were installed earlier this week.

I have been a bit slack and haven't taken a photo of our roof tiles, it's hard to take a good photo with the scaffold still up.

Bricks are to be cleaned next then comes the cladding, so once the scaffold is down, I'll be able to take a photo.

In the meantime, nearmap.com has updated their photos, so here is the timeline from September 2011/May 2012 and the most recent being 2nd of August 2012.



Satellite View - Our house outlined in red

The golf course and clubhouse open at the end of the month. Looking forward to sharing some good times there in the future.

Wednesday, 1 August 2012

Tile Consultation

Our tiles have been chosen!

Our builder prefers to do tile selections once the bricks are started, this ensures all tiles are available and not discontinued or out of stock when it comes to laying them.

We definitely weren't as prepared for the tile consultation as we were the colour consultation, and it proved difficult to do homework, as it's hard to know by looking at magazines and display homes what things are really worth!

Our consultant was extremely helpful, and reassured us about colours

We also had an idea of what we thought we would spend, but once we were there and the creativity started flowing, it wasn't long until we were over the "budget"... oops!

So here are our selections:

Floor tiles - Downstairs - Mocha Matt 450 x 450



Downstairs Powder Room -Floor - Mocha Matt 450 x 450 to floor - straight lay
Concealed Floor Waste
Splashback - Feature tile between vanity and mirror including return
(Vanity - Mushroom Linea. Caesarstone - Osprey)



Kitchen -Floor - Mocha Matt 450 x 450
Splashback - 300 x 600 Horizontal Lay  (including Butlers Pantry)
Mosaic lay 2 rows wide vertical in line with cooktop finishes (Excluding Butlers Pantry)
(Lower cupboards - Nocturne Oak. Feature Cupboards - Stipple Hemp. Caesarstone - Almond Rocca)




Laundry -

Floor - Mocha Matt 450 x 450
Square Floor waste
Skirting - Mocha Matt 1/2 tile
Splashback - 300 x 100 lay stack bond




Upstairs Powder Room/Main Bathroom -Floor - Mocha Matt 300 x 300
Square Floor waste
Walls - Snow White 300 x 600 - Horizontal Lay
Splashback - Feature tile between vanity and mirror
Shower Niche - Splashback tile repeated in niche
(Vanity - Mushroom Linea. Caesarstone - Osprey)



Ensuite - Floor - Charcoal Satin 300 x 300
Concealed Floor Waste
Feature wall behind Freestanding Bath - 440 x 890 Lay Horizontal
Walls (including splashback) Snow White - 300 x 600 Lay Horizontal
Shower Niche - Mosaic
(Vanity - Mushroom Linea. Caesarstone - Osprey)



Friday, 25 November 2011

An update....

With our house sold, a 30 day settlement and the mad hunt for a rental, the last thing I've had time for is to update my blog.

So whilst I procrastinate packing the last of our possessions to make the move over this weekend and Monday, I thought an update was in order!

We've approved our 2nd set of plans to now go to the SCR committee, and then onto DA approval with council.
Work is progressing in our street, it's still fenced off, so we can't get up there, but each week we drive up to the gates and peer over. There is asphalt being laid, pipes being placed in the ground and machinery buzzing around up there.

The golf course clubhouse is progressing well, and we're hearing that it will open in April next year.
We're looking forward to being able to walk 250m down the road to the clubhouse for dinner or lunch in the future.

We believe that our land will settle in February/March 2012, so we've got some time to save some money and work through our internal colour selections and tile selections.

Now for our exterior colour selections:

Bricks - BORAL - Blackheath
Mortar - Off white/Raked


Tiles - Monier Elabana profile in Barramundi
Guttering - Ironstone
Fascia - Paperbark

















Downpipe/Rainwater Tank - Ironstone

Windows/Flyscreens - Paperbark

Cladding - Taubmans Coffee Break










Garage Door - B&D Panelmasta Contemporary - Merino (Paperbark)

Front door - Corinthian Doors - Pivot door











 So I guess I had best be off, more boxes to pack!!

Until next time....