It has been 3 months.....

It's hard to believe we have been in our home for 3 months now.

Time has just flown by, it has been a whirlwind of getting things done.

Since my last update, we have bought interior lighting, and downstairs is all installed.
We chose a lovely LED downlight that gives a warmth to the house & a mix of pendants for the bedrooms, dining & kitchen bench.

My gorgeous David Trubridge Coral pendant is still to be installed and I can not wait to see it hanging in all its glory!
We have poured a slab down the side of the house and installed a shed.

Built some garden beds around the perimeter of the back yard & filled with dirt.

Shutters & blinds have been installed, they are just gorgeous.

Hired a bobcat (and yes, I learnt to drive a bobcat!) and spread 30 tonne of turf underlay in the front & back yard.

Frosted the front door & WIR window.

Installed shelving to the garage.

There are still a few things left to do, next weekend we will spread crushed granite on the narrower side of the house, pour concrete steps for the laundry & garage external doors and Easter weekend sees us laying TURF!!!

Then I think it's time to relax for a bit, before we look at paving the front porch & alfresco and doing a few other bits & pieces.

Our 3 month maintenance check list is due to be submitted, a few things that need addressing, so hopefully they will be sorted in a timely manner.

I was asked the other day if there is anything I would change about the house, I can't think of anything, it is perfect, the kitchen is easy to navigate around, everything seems well placed and well thought out.
I recently read an interior design book and when talking about house lay out, I found myself nodding along and smiling to myself that Rawson has designed a functional home.


Until next time

x

P.S Thanks for visiting, 20,000 hits, WOW!
Kitchen






Shed Slab

Sunday, 8 July 2012

Frames etc

I've been a bit slack with the updates!

It's been moving along quite quickly, since my last update, we've had plumbing & sewer connections done, windows delivered (about 2 weeks early!), frames delivered and started and our site fence erected.

Here are some photos of the story so far....


Slab

Windows - Delivered 2 weeks early! Oops

Our frames

First floor started

The kitchen & butlers pantry

Alfresco

The view from the corner of the backyard

Currently there are carpenters working on the second floor frames, soon it will resemble a house!!

Monday, 25 June 2012

Slabulous

Who'd have thought concrete could be so exciting!

Slab - 8:30am

Slab 5pm

Thursday, 21 June 2012

More progress...

Another busy day on site. Pipes, reo & waffle pods installed....



Front corner

Front view

View from the back corner