Friday, 19 October 2012

Another update

It's been a few weeks since my last update.

Since the last update the wet areas have been tiled and grouted.
The kitchen and pantry splashback has been tiled and grouted.

In the coming week, the tiling should be completed - the main floor is done after the painter has been through. Kitchen bulkheads should be framed up and the gyprockers will return to finish the bulkheads and patch up around the stairs & a few other things that needed to be set.

I've also done a little bit of retail therapy over the last week, some towels, hand towels and some cushions for the lounges. Can't wait to put all the finish touches on our home.
Not sure when we'll be in, our supervisor said he expects it to be finished mid-late November, so we'll see how we go.
We were lucky enough to get a few photos of the tiling.

So here they are:
We weren't 100% on the kitchen splashback when we first saw it, but I love it now, it's really unique, a few people who I have shown the photos to have asked if it's rusted metal, it is really rustic looking and will look fantastic once everything comes together.

Kitchen - Splashback

Butlers Pantry
Kitchen - Splashback
Ensuite
Ensuite

Friday, 5 October 2012

October Update

Not much to report this week, with the long weekend it has been a bit slow.

Tiles have been delivered, baths and laundry tub have arrived too.

So I suspect there will be more to report next week.

Over the long weekend we did a little more shopping, a few essentials.
We bought bar stools for the island bench and a dishwasher.
I can't wait to use it the dishwasher. In the 8 years we have been together we have never had a dishwasher.
It's ASKO and it is fully integrated.

We also had a look at some pendant lights for over the island bench and like the look of some concrete pendants.
We will buy these in the coming weeks. There are few items of furniture still to be purchased, but they aren't vital, we can slowly add these as we find them.

Our second last progress payment came thru yesterday so the end is drawing near.

Here are some photos;



Bar Stool on the Right




                     ASKO - Dishwasher






Kitchen Splashback Tile


Thursday, 27 September 2012

Kitchen is IN! - September Wrap Up

With September coming to a close, it has indeed been a speedy September!

Since the last update 99.9% of the external carpentry has been completed, there are still some trims to be completed.

Gyprock is done, with a few bits still to be done, including bulkheads above kitchen and underneath the stairs including the ceiling in the powder room.

The kitchen and stairs are in! It's starting to feel like a home now.

Here are some photos;



Kitchen



Kitchen



Kitchen

Butler's Pantry
Butler's Pantry
Shelving in Ensuite
Main Bathroom
Upstairs Toilet
Stairs
Stairs
Stairs
Upstairs Balustrade

Thursday, 20 September 2012

Lounge Shopping

We bit the bullet and started our furniture shopping last night.

There were a few lounges to buy, and I think we're pretty pleased with the outcome.

This is what we have ordered:

Upstairs Lounge - Colour as pictured

Storage box for the end of our bed in colour below

Warwick - Belize Smoke

Family Room in "Shale" leather x 2

Theatre Room - 4 Seater with Ottoman (2 x recliner & 2 Storage & 2 drink tables) in "Raven"

The good news will be ready in time for Christmas... except the leather lounges, they should arrive in the new year.

In other house news, gyprockers have been working hard all week, they set yesterday with basecoat.

The carpenter is getting there slowly... He managed to do the bulkhead in the entry yesterday.
Still to do rear lower eaves and the trim on the front cladding.

We're on track for fix out carpenters to come through next week!!

Monday, 17 September 2012

Mid September Update

Things are progressing well so far this month.

We've had the rear roof installed, metal roof over garage and front porch installed, bathroom waterproofed, air conditioning roughed in, electrical roughed in, bricks washed, insulation installed, and today the gyprock arrived for a start tomorrow.
Our SS is sticking to the scheduled dates he gave us a few weeks back.

I'd like to tick the box that says cladding complete, but oh my gosh, we have the worlds slowest carpenter working on our place.
Not sure what his story is, but he started back on the 21st of August!
He has slowly been cladding the front.... it's almost complete, it just needs the trims to be done.

Then there is the easylap boards at the back, he's done part of the (rear) side of the house, but the back of the house is still to be done....
It would have been nice to have made the house watertight before the insulation went in.
The back of the house is still exposed, I'm just hoping the rain we've had this afternoon hasn't ruined the insulation.

No doubt the gyprockers will be waiting for him to do our lowered bulk heads in the kitchen and entrance.
Then there are the eaves at the back to be done too.

He is so frustrating!!



Saturday, 8 September 2012

Picking up pace...

This week progressed well!

Rear lower roof went on Monday, our missing gutter also went on too.

Thursday saw the installation of the metal roof to the garage and front porch including trims and box gutters .

Friday, the cavity sliding door to the laundry was installed to enable the wet areas to be waterproofed.
The waterproofer will return once the walls are gyprocked to complete the work.

Our SS gave us a few key dates to look forward to.
The main ones should see gyprock on the 17th September, fix out on the 24th September and the most exciting one, kitchen on the 28th September!!!

Here are some new photos (with all the wind our fence blew over)


Saturday, 1 September 2012

Could it be a speedy September?

What an end to a slow August!

Friday saw the scaffolding being removed, the timber frames for the front porch installed and the roof rails put up on the back roof.

Next week our back roof should go on, as well as the garage roof and porch roof. Once this is done the cladding will be finished off.

Lock up is drawing closer but no real time frame.

The golf clubhouse opened yesterday, we went for lunch there today.
We parked out the front of our house and walked the 250m to the clubhouse.

Here are some photos of our house with the scaffold down.